POWER4MED Supporting Structure for Ferries

Tailored to Mediterranean fishing operators, boat designers and builders, the Green fishing supporting structure is composed of two toolkits addressing respectively:

short-term toolkit, improvements that are currently (2025–2030) achievable thanks to solutions widely available off the shelf and aligned with the regulatory regime currently in force;

medium-term toolkit, interventions that are likely to be possible from 2030 thanks to enabling factors being deployed such as, for example, alternative fuel infrastructures, green corridors, shipbuilding value chains as well as a finalised regulatory regime (as of today still under development).

SHORT TERM Energy Transition Toolkit for Ferries

AIMS & CONTENTS
Introduction to the Short Term Toolkit
ADAPTATION and/or STRATEGY PLAN
Mediterranean Shipyard Transition Plan

Download additional appendixes

CAPACITY BUILDING COURSES
EXAMPLE SPECIFICATIONS
Mediterranean ferries transformation works

Download here the appendixes

Local ferries retrofit specifications

Download here the appendixes

RELEVANT DOCUMENTS, PROJECTS
FINANCIAL TOOLS

ADDITIONAL VIDEOS

MEDIUM TERM Energy Transition Toolkit for Ferries

AIMS & CONTENTS
Introduction to the Medium Term Toolkit
ADAPTATION and/or STRATEGY PLAN
Mediterranean Shipyard Transition Plan

Download here the appendixes

Strategy for Med-African Ports

Additional documents here

CAPACITY BUILDING COURSES
Compendium on Greening regulatory framework and issues

Continue the course here

MT qualification scheme
EXAMPLE SPECIFICATIONS
Full Electric local ferry

Download here the appendixes

Fuel-ready ferries

Download here the appendixes

RELEVANT DOCUMENTS, PROJECTS
FINANCIAL TOOLS

Contact POWER4MED experts for free support